Thursday, March 08, 2007

Eluru Construction Progress

Below are some photos of the on-going construction of the new SCJ residence for theology students. The community will move in during the month of May 2007.

The front entrance to the main residential building: The dining area in building to left, the main building to the right:The dining room:
Walkway outside of dining room, in front of the building:
Residential area, second floor:
Roof terrace, main building:
From roof terrace, the garage, and kitchen / dining area (Indonesian garden left of center):

No comments: